Re: Huncoat Cable Cars !
The cable car didn't come all the way from the quarry, though. At the quarry site itself, there was a little railway which went across a small bridge over the path that led down to Kingsway. Small trucks transported the clay down the hill to a point near Burnley road and it was then transferred to the cable cars.
__________________
|