mani 15-01-2009 13:37

HAHA i was right about blackburn road relaying surface..
 
got a letter through the post

Quote:

as you are probably aware the new surface laid in october 2008 has failed in several places

it will be necessary to remove the defective road surfacing material and lay a new surface. test have shown surfacing materials which were originally laid did not meet specification. the works will be undertaken at the expense of the materials supplier. work is set to commence on 18 january

traffic controls will be set up similar to the original works
expect more delays folks!!

emamum 15-01-2009 13:38

Re: HAHA i was right about blackburn road relaying surface..
 
they are relaying surfaces up here as well (woodnook) some one has a dodgy calender cos the letter i have says 19th and they started on monday ..

mani 15-01-2009 13:45

Re: HAHA i was right about blackburn road relaying surface..
 
yeah

and here there's no sign of anythign yet... but it took longer than a week to unlay and then relay the surface

magpie 15-01-2009 15:55

Re: HAHA i was right about blackburn road relaying surface..
 
same in ossy.... must have a bit of spare cash around :-)

jaysay 15-01-2009 15:59

Re: HAHA i was right about blackburn road relaying surface..
 
Quote:

Originally Posted by magpie (Post 669449)
same in ossy.... must have a bit of spare cash around :-)

No magpie its the County Council Elections in May.

panther 15-01-2009 17:26

Re: HAHA i was right about blackburn road relaying surface..
 
Wasting money...again!!, if they did the job right in the first place.......

magpie 15-01-2009 21:31

Re: HAHA i was right about blackburn road relaying surface..
 
Quote:

Originally Posted by jaysay (Post 669452)
No magpie its the County Council Elections in May.

oh I will be voting this year....

Neil 15-01-2009 21:47

Re: HAHA i was right about blackburn road relaying surface..
 
Quote:

Originally Posted by panther (Post 669490)
Wasting money...again!!, if they did the job right in the first place.......


At least it is not a direct waste of our money this time.

The materials supplied where sub standard so the full cost of the resurfacing is being paid for by the material supplier and not LCC.


If you want to complain about money wasted by LCC have a look what they have been doing to school yellow zig zags recently.

accyman 16-01-2009 11:07

Re: HAHA i was right about blackburn road relaying surface..
 
they could save a fortune by not putting any road markings along hyndburn road like give way markers or yellow lines etc seen as none of the rules of the road exist down there why bother wasting the paint

accyman 16-01-2009 13:05

Re: HAHA i was right about blackburn road relaying surface..
 
oops i meant blackburn road not hyndburn road

maybe an admin or mod will be kind enough to edit my post to show blackburn road please :o

BLACKBURN RAVER 18-01-2009 13:19

Re: HAHA i was right about blackburn road relaying surface..
 
Quote:

Originally Posted by accyman (Post 669679)
why bother wasting the paint

its not paint its melted plastic :rolleyes:..


the council cant win can they, you lot moan because the roads are crap and you moan when they do something about it ....jeeeeeeeez some people :mad:

Neil 18-01-2009 13:45

Re: HAHA i was right about blackburn road relaying surface..
 
We are not moaning because they resurfaced the road, most road around here need doing. We are moaning because they did it and the road fell to bits again after a few weeks so it needs doing again

emzy 18-01-2009 13:51

Re: HAHA i was right about blackburn road relaying surface..
 
Quote:

Originally Posted by Neil (Post 669581)
If you want to complain about money wasted by LCC have a look what they have been doing to school yellow zig zags recently.

Have been wondering what they are doing with them, theyve removed the ones at the school opposite me but nothing more has happened since then

BLACKBURN RAVER 18-01-2009 13:59

Re: HAHA i was right about blackburn road relaying surface..
 
Quote:

Originally Posted by Neil (Post 670325)
We are not moaning because they resurfaced the road, most road around here need doing. We are moaning because they did it and the road fell to bits again after a few weeks so it needs doing again


but its not the councils fault, its the fault of the tarmac suppliers who's tar wasnt upto the requied standard, hence the cost of the new surface being paid by them and not the council !!

BLACKBURN RAVER 18-01-2009 14:00

Re: HAHA i was right about blackburn road relaying surface..
 
Quote:

Originally Posted by emzy (Post 670327)
Have been wondering what they are doing with them, theyve removed the ones at the school opposite me but nothing more has happened since then


they will be being relaid, the ones currently down do not now confirm to goverment size regulations or sumatt (so not legal) so new ones which will conform are gonna be put down..


All times are GMT. The time now is 17:04.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Friendly URLs by vBSEO 3.6.1
© 2003-2013 AccringtonWeb.com