Re: Roadworks Lancs V Cumbria ?
A bit like the work on the £40million Penine Reach. It was scheduled to take 40 weeks and the Blackburn section is still like a dogs breakfast more than a year on.
I do not go into Blackburn much, but each time I have gone through, it has looked like very little has been done
__________________
The world will not be destroyed by evil people...
It will be destroyed by those who stand by and do Nothing.
(a paraphrase on a quote by Albert Einstein)
|