Re: On Behalf of Gayle Night
Gayle
The estimated cost of this project is "£50,000" what is actually included in that figure, have there been any site surveys to check if there is in fact enough material up there to complete, have thoughts been given to access for contractors equipment, and damage caused by that equipment in getting to the site.is that included in the £50,000.
__________________
Anyone who has never made a mistake has never tried anything new.
Albert Einstein.
|