View Single Post
Old 05-08-2006, 22:27   #10
Madhatter
God Member
 

Re: Hyndburn Homes Inspections

NO. first day on a joint kitchen and bathroom project with just replacement of sockets switches to fit the new layout not a rewire is...
Day one strip out of both except bathroom suit ie wallpaper etc in bathroom
day two electrics and strip out old and fit new bathroom suit
day three electric and finishing bathroom
day four decorating bathroom, and fitting new kitchen
day five finishing fitting new kitchen and what should be second electrical fix but they don't do one they bodge it. second plumbing fix sink washer etc
day six decorating kitchen papering
day seven decorating gloss
day eight decorating walls
day nine floors down
day ten standing over the road looking like workmen pricing a job(see gallery competition 10)Sharp intake of break, shakes head, this is a big job.
__________________
Acc-y-web-web-web, push pineapple, shake the tree
Accy-web-web-web, push pineapple, grind coffee
To the left, to the right, jump up and down and to the knees
Come and write every night, chat with a hula melody
Madhatter is offline   Reply With Quote