I have been advised that the bathroom works will take place in approx three weeks.
I pointed out that a 'wet room' was more than I needed - a curtained shower stall was quite adequate and much less costly from their point of view.
As a result, a mutually agreeable compromise has been reached.
A largish 'normal' shower area, lever taps
and -
I am to get my (mid thigh level) basin, and my antique (sloping) loo replaced at the same time.
I volunteered to fund the replacement of floorcovering.
....a satisfactory outcome
