Quote:
Originally Posted by g jones
I met with National Grid who are analysing the supply from Heysham and Sellafield. The latter going from 200 megawatt with a new reactor to 3.6 gigawatt. A whole new electricity backbone will have to be put in place.
.
|
can anyone with a bit of technical/electrical knowledge tell us how much bigger % wise 3.6 gigawatt is over 200 megawatt .... seems heck of a lot
