Re: Heyes playing fields.
At the start of this project, the firm building the pavilion, dug out an area the size of 4 tennis courts down to a depth graduating between 2' and 5'.
There was a heck of a lot of topsoil heaped up and shipped out by convoys of lorries.
Now, the firm constructing the football pitches, are shipping soil IN by convoys of lorries. (starting at 7.30am - groan)
Totally illogical!
Another sign of poor organisation was the brick built meter shed with its concrete slab roof and white painted door.
It took several days to construct - yesterday demolished.