Quote:
Originally Posted by MargaretR
At the start of this project, the firm building the pavilion, dug out an area the size of 4 tennis courts down to a depth graduating between 2' and 5'.
There was a heck of a lot of topsoil heaped up and shipped out by convoys of lorries.
Now, the firm constructing the football pitches, are shipping soil IN by convoys of lorries. (starting at 7.30am - groan)
Totally illogical!
Another sign of poor organisation was the brick built meter shed with its concrete slab roof and white painted door.
It took several days to construct - yesterday demolished.
|
Why if it was a temp building that needed to be secure?
As for the soil maybe they need a better quality of soil for the pitches that allows fast water drainage. What they dug out may have been too heavy and full of clay.