wadey 22-04-2009 14:27

Re: Brittania Crossroads
 
THE parents of a man who died in a smash at a notorious junction have hit out after a £650,000 safety scheme was delayed.

Lancashire County Council has already approved the spending of £50,000 to buy three areas of land at the Britannia crossroads in Oswaldtwistle to build the "life-saving" roundabout.

But the scheme has hit delays. Although the money is in place there have been problems with acquiring the land.

jaysay 22-04-2009 16:25

Re: Britannia Crossroads
 
Quote:

Originally Posted by wadey (Post 706904)
THE parents of a man who died in a smash at a notorious junction have hit out after a £650,000 safety scheme was delayed.

Lancashire County Council has already approved the spending of £50,000 to buy three areas of land at the Britannia crossroads in Oswaldtwistle to build the "life-saving" roundabout.

But the scheme has hit delays. Although the money is in place there have been problems with acquiring the land.

That don't surprise me one little bit:(

Neil 22-04-2009 16:36

Re: Brittania Crossroads
 
Quote:

Originally Posted by wadey (Post 706904)
THE parents of a man who died in a smash at a notorious junction have hit out after a £650,000 safety scheme was delayed.

Lancashire County Council has already approved the spending of £50,000 to buy three areas of land at the Britannia crossroads in Oswaldtwistle to build the "life-saving" roundabout.

But the scheme has hit delays. Although the money is in place there have been problems with acquiring the land.

So why was it not finished months ago???

They started work in November, could have been October but definitely mentioned at the November Area Council Meeting.

I pass almost daily and there is almost nothing done from one day to the next.

MCR ADIM 22-04-2009 22:02

Re: Brittania Crossroads
 
They have built a little island on the left on the new lane side, i run past most mornings, thats biggest change in how many months

Neil 23-04-2009 06:08

Re: Brittania Crossroads
 
Quote:

Originally Posted by MCR ADIM (Post 707086)
thats biggest change in how many months

Its getting on for 6 months now

jaysay 23-04-2009 09:27

Re: Brittania Crossroads
 
Quote:

Originally Posted by Neil (Post 707128)
Its getting on for 6 months now

Their waiting for a photo call with Dorothy, Neil:rolleyes:

accyman 23-04-2009 16:34

Re: Brittania Crossroads
 
perhaps they are taking so long in doing it so that it sinks into the thick head boy racers that are the cause of the majority of accidents up there that the road is actually changing

after they have zoomed past for a few months it may gradually sink in that they have to slow down

shoudla slapped a speed camera at the junction and made money instead of spending it , they would only zoom past once lol

entwisi 24-04-2009 11:56

Re: Brittania Crossroads
 
Posted via Mobile Device
I would whole heartidly agree. This is absolutely one place a speed camera would be welcomed and seen not as a cash cow.

Neil 24-04-2009 13:35

Re: Brittania Crossroads
 
You would need two, one in each direction. Or one of those reversible ones.

Next we need Lottice Lane resurfacing. It must be one of the worst roads in Hyndburn.

jaysay 24-04-2009 16:26

Re: Brittania Crossroads
 
Quote:

Originally Posted by Neil (Post 707533)
You would need two, one in each direction. Or one of those reversible ones.

Next we need Lottice Lane resurfacing. It must be one of the worst roads in Hyndburn.

Get onto your County Councillor Neil, mind you you'll have to pop over to Clayton to see her, we don't have a county councillor living in Ossy, well not at the moment that is:rolleyes:

Neil 24-04-2009 17:13

Re: Brittania Crossroads
 
Quote:

Originally Posted by jaysay (Post 707596)
Get onto your County Councillor Neil, mind you you'll have to pop over to Clayton to see her, we don't have a county councillor living in Ossy, well not at the moment that is:rolleyes:

I was sat next to her for 2 hours at the last Area Council meeting and forgot to ask her what the completion date is and why it has taken so long.

I think they are using it as a fill in job to make it as cheap as possible. I feel sorry for the people who live up there. Living next to that mess for all these months is out of order.

accyman 24-04-2009 21:48

Re: Brittania Crossroads
 
i suppose its good if tehir kids are bob teh builder fans in which case it will be like a 2 year long play for teh kids to watch through tehir windows at this rate lol

katex 25-04-2009 11:20

Re: Brittania Crossroads
 
Quote:

Originally Posted by Neil (Post 707620)
I was sat next to her for 2 hours at the last Area Council meeting and forgot to ask her what the completion date is and why it has taken so long.

I think they are using it as a fill in job to make it as cheap as possible. I feel sorry for the people who live up there. Living next to that mess for all these months is out of order.

It is due to be completed 15th June Neil ... so a few weeks as yet.
Think the council have been cautious on this one to get it right as very controversial and, of course, the land acquisition took time.

Quote:

Originally Posted by Neil (Post 707533)
You would need two, one in each direction. Or one of those reversible ones.

Next we need Lottice Lane resurfacing. It must be one of the worst roads in Hyndburn.

Does say includes road reconstruction on Lottice Lane, not sure to what extent though ?

Neil 25-04-2009 11:35

Re: Brittania Crossroads
 
Kate, they started work in early November 2008 if not sooner. Weeks have past with no work being done. Nothing to do with cautious, all the planning was done well over 3 years ago. Yes they said delays were down to acquiring the land.

I want to know why it has taken so long to build it? June will be 7 months plus to build a roundabout. I bet it would not have taken that long if the roadworks were in the middle of Preston :(

Whoever is responsible for this work should be explaining what is taking so long.

Neil 25-04-2009 11:37

Re: Brittania Crossroads
 
Maybe if our County Councillor Dorothy Westell lived in Ossy and used the junction almost daily as I do she would have kicked ass and had it sorted months ago.


All times are GMT. The time now is 08:39.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Friendly URLs by vBSEO 3.6.1
© 2003-2013 AccringtonWeb.com