Re: HH already cancelling jobs
I have to admit this was my fear when I heard that Contour homes won the contract over us (Twin Valley Homes). We had heard that they were good at not delivering the promises they had made elsewhere and I also have to deal with them regarding properties they have in the Blackburn area (and that can be fun!!).
Hyndburn Homes is now known as a registered social landlord (RSL) as Lancsdave has said which to be honest means they have the same duties as a council housing dept..... but if they didn't organise their funding correctly then you will get these delays.. IMHO they started the improvement to quickly after transfer and sounds too me like the funding wasn't properly in place!! |
Re: HH already cancelling jobs
Just had cruden inspector up, to re draft the kitchen plans apparently there was a major fluff up, especially up here where most properties still have asbestos which has admittantly delayed things & some points of the design wasn't practical for the fittings - like this guys honesty unusual in this field lol.
So now re-scheduled for getting work done around the end of May/begining of June, also managed to alter a bit of space for future appliance if should need a chest freezer, still want a dish washer tho:( lol but least there if should need it before too late which i was concerned with last plan after it was done. |
Re: HH already cancelling jobs
You've got a dishwasher, albeit a tempremental one :rolleyes:
|
Re: HH already cancelling jobs
Quote:
|
Re: HH already cancelling jobs
In week commencing 26th March I had my central heating (warm air) replaced with combi boiler and rads. Workmen were in every day for 5 days.
The job is still not finished because the plasterers and joiners cant keep up with the plumbers and electricians so there is a 2 -3 weeks delay before they arrive. At present there are so many exposed pipes needing boxing in that the place is like a submarine (all piping is 'surface mounted' , some covered by plastic trunking). When the job is eventually complete I will need to redecorate everywhere at my own expense. A bit pointless really because next year they are scheduled to rewire, and refit kitchen and bathroom. All this repair work is needed and will be appreciated, since I want to see something to justify a rent increase of over 10% this year. I just wish the project had been better planned -eg. better co ordination between work teams and some thought given to the 12 month wait before rewire happens. (then again - it might not happen judging by this news) |
Re: HH already cancelling jobs
Yeh we had ours done in january much needed replacement to blowers, they didnt do a bad job & kept to schedule within 7 days complete. We are down for the kitchens to be done soon & a full rewire sometime i dont know when. Tho they told us that they will compensate rooms that need a full decoration with vouchers & the kitchen & bathroom will be done by them anyways - so all not that bad, better than the previous waste of spacers.
|
Re: HH already cancelling jobs
Thanks for the good news that there will be some compensation for some redecoration.
|
Re: HH already cancelling jobs
Quote:
|
Re: HH already cancelling jobs
I would have preferred all the mess in the same year, but I suppose the have to do a bit of something for everybody each year. The rent goes up in 5 annual stages to a 'target rent' - I haven't been able to find out what this target rent is - (I don't get any housing benefit, so it matters) I have a friend who lives in a Twin Valley flat in Darwen similar size to mine and he paid £15 a week more than me last year.
|
Re: HH already cancelling jobs
Quote:
|
All times are GMT. The time now is 11:36. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Friendly URLs by vBSEO 3.6.1
© 2003-2013 AccringtonWeb.com