accymel 26-04-2007 15:55

Re: Asbestos
 
3 Attachment(s)
Pic 1 the kichen partition taken of & asbestos
Pic 2 the bathroom cupboard bottom
Pic 3 the bathroom cupboard top

SPUGGIE J 26-04-2007 18:18

Re: Asbestos
 
Quote:

Originally Posted by accymel (Post 416025)
Pic 1 the kichen partition taken of & asbestos
Pic 2 the bathroom cupboard bottom
Pic 3 the bathroom cupboard top

Hope they fix the mess they made.

As for that still there som No More Nails and 3 mil ply should do the trick.

carl hurles 26-04-2007 19:20

Re: Asbestos
 
hows ur stairs accymel? ours are cracked and thayve had to make a frame to hold it up how long it will last i dont kno

davo69 26-04-2007 20:20

Re: Asbestos
 
look at room and seel worke men in untill they have got pannels down then they can exit .if you left window open you risk spreding all over you dont want any drafts at all.if they dont brake pannels no risk .dont forget any pannels they are removing damp down first this will decrease any dust .i worked for a recycling company for two years this is good practice.main thing to remember is that tiny contact is not harmfull working all the time with it is. that is why any one who knows what they are doing will take all precortions possible when pannels sre removed they should vacume up the area with a vacume that does not let any air loss hope this helps but dont worry u will be fine.

accymel 26-04-2007 21:43

Re: Asbestos
 
Quote:

Originally Posted by carl hurles (Post 416116)
hows ur stairs accymel? ours are cracked and thayve had to make a frame to hold it up how long it will last i dont kno

A bit nervous of them, they have put 2 support timber to support the mini landing altho from the stairs u can see thro to kitchen thro the slit between plaster board & skirting boards, so was it u i heard then with the wobbly stair landing about last friday?? LOL Hopefuly im sure the inspector is coming tommoz to check them, had to warn the kids for not playing or jumping up & down the stairs just so not to tempt fate.

Just tested the bath out as well as its only 2 walls now, no movement so thats fine:D

Mind u walls sockets on the fridge side dont work altho worked fine till they plugged transformer in tho not their fault it didnt blow fuses or owt, but think its a problem that started when they took the econ 7 out, which has now knocked the circuit off when these guys tried to start, so got the electrican coming 1st thing.

MargaretR 26-04-2007 21:49

Re: Asbestos
 
Waves of sympathy heading your way from me, Mel
I was whacked just getting the new heating in - what you have had today is a nightmare by comparison - rest up and let the mess lie for a day or two.

accymel 26-04-2007 21:53

Re: Asbestos
 
Thanks Margaret, seems one thing to another, wonder what problem there is with the electrics in kitchen whether they are going to make more mess tommoz, then in 3 weeks or so time we got the big job of kitchen to be fitted & old taken out then the bathroom & then after that the re wire:eek:. Be easier to knock down & rebuild the house as Jack made a hash of it to start with :rofl38:

MargaretR 26-04-2007 21:56

Re: Asbestos
 
That is all too much mess in a short time - you could reasonably ask for several weeks breathing space between jobs

accymel 26-04-2007 21:59

Re: Asbestos
 
Would prefer to get it over with, as todays jobs look unsightly, least then i can have a reasonably nice home once they've finished then hopefully relax & enjoy eventually LOL:D

MargaretR 26-04-2007 22:02

Re: Asbestos
 
It is more than I could cope within that short time scale. If you reach the end of your tether at any time- just ask for next job to wait while you rest up

accymel 26-04-2007 22:07

Re: Asbestos
 
Yeh sure will, altho i wonder if they will pay for a health farm for a couple of days pampering while they do the house up :rolleyes: probably not but nowt wrong with wishful thinking or dreams hehehehehehe

MargaretR 26-04-2007 22:21

Re: Asbestos
 
Well today hasnt spoilt that wonderful sense of humour :D - good for you - if anyone can cope with it you can!!

carl hurles 26-04-2007 23:57

Re: Asbestos
 
well for us thay came the day befor you and the stairs arnt safe as the wooden beam things thay tried to make is craced and so is the top corner of the stairs so its only a matter of time befor we go ouch and the bathroom well its a bit like urs bare lol

accymel 27-04-2007 11:13

Re: Asbestos
 
Has the inspector overseeing this had a look at it Carl?? When have they booked u having your kitchen & bathroon done?? Ive got another 3 weeks approx or so to wait for mine & put up with it like it is:)

Still waiting for the sparkie, just rang HH to find out if he's lost and as per typical - their systems are down & crashed again:rolleyes:

accymel 27-04-2007 11:16

Re: Asbestos
 
:rofl38: HH has just got abck to me with systems sorted, the electrician is booked for the afternoon not the morning as was told [you have to laugh & least they admitted their error lol] luckily in anyways but least he ain't missing hehehehehe:D


All times are GMT. The time now is 00:06.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Friendly URLs by vBSEO 3.6.1
© 2003-2013 AccringtonWeb.com