Ground Capacity

BUT...Jimmy Bell in his weekly LT Column thinks otherwise Cashy !...Quote " Dave O'Neill and Rob Heys have bent over backwards ( Wow !)..to try to get fans in ! "...

Which makes me think that I must either have missed a liitle morsel of erotic half-time entertainment, or that we have 2 Contortionists at the Helm !!..
If the latter is the case, then this might confirm the scathing condemnation contained in your post, as 'Contortion' is of course closely concerned with '
the act of twisting or wrenching !'..makes you think ???.




Subtract one of those names @ add another n ya will be nearer to what i was alluding, the one ya subtract don't qualify as a bloodsucker to my mind, if i had said numptys though it would be accurate.;)
 
what's 'approx' seats? are some of them occasionally seats and occasionally upturned milk crates?
counting the seats on the stadium planner on the ticket sales site Rob!! I may have miss counted or over counted thats why approx ;):).Eithere way we have more than the required amount of seating we need:confused:
 
Its called BENDING the truth abit :rolleyes: So like i said at the moment its 4,503 which includes 2107approx seats...:)

So plan A would be to remove (with the help of the ultras :rolleyes: ??) 107 seats to make a new standing area wouldn't it....
 
Just to stop everyone worrying.
The plan IS to knock the breeze block wall down and add a temporary stand behind the coppice terrace (approx 5/6 extra steps)
All done in plenty of time ( fingers crossed )
 
Just to stop everyone worrying.
The plan IS to knock the breeze block wall down and add a temporary stand behind the coppice terrace (approx 5/6 extra steps)
All done in plenty of time ( fingers crossed )
"Fingers cossed" is that the same as a wing and a prayer:D
 
Just to stop everyone worrying.
The plan IS to knock the breeze block wall down and add a temporary stand behind the coppice terrace (approx 5/6 extra steps)
All done in plenty of time ( fingers crossed )

Just like last year. Stop worrying everyone. The tax bill will be paid in plenty of time. We have had over five years to get this sorted out. If Barnet finish in the bottom two of the league I am sure that they will put in a protest and get us thrown out if we do not have the required capacity.
 
If Barnet finish in the bottom two of the league I am sure that they will put in a protest and get us thrown out if we do not have the required capacity.


After what happened to them a few years ago, I suspect Stevenage might be happy to back any such protest after they've visited The Crown and seen the 'facilities'.
 
any up date on the new steps?and when control room is dun the thats made out of wood weres the h@s there over a water tank to mmmmmmmmmmmmm h@s.
 
This has gone quiet recently. Has anyone been up to the ground recently to see that work is proceeding as planned and hasn't been affected by the inclement weather?
 

Was by the ground to-day - no sign of any construction. Vaguely remember reading somewhere that RH was quoted as saying that all would be complete by the 18th December! :eek:
 

Was by the ground to-day - no sign of any construction. Vaguely remember reading somewhere that RH was quoted as saying that all would be complete by the 18th December! :eek:

Doubtless, the club will be asking for volunteers to help them out with last minute construction work in the final week of December. :rolleyes:
 
RH also said that the control room would be up and running in time for "our next home match", which at that time was the Shrews game. Has this actually happened?
 
Is it not only a temporary stand ? Would have thought it will only take a couple of days to put up some scaffolding and a few planks
 
Back
Top